Patterson Architects Projects


Posted on January 01, 2005
Liberty Hill State Bank
New full service banking facility for State Bank. Design was developed utilizing modular buildings with precast structural slabs. The design was similar in size and finishes with the Wellborn Road branch, the project was a test building system to be used by State Bank for new branches with project construction time and costs cut by ordering the structures as modular building systems. [Read more...]

Actions: E-mail | Permalink |


Posted on January 01, 2004
University Title
A 7600 square foot renovation to the existing office complex with a 1000 sf addition enclosing the covered porch.  Renovations took place with the business operating at full capacity.  Design involved demolition of existing walls and fixtures.  Enclosing covered porch for additional office space.  Renovating entire office to accommodate the reorganization of the business.  Patterson Architects developed design and schedule with the users approval.  Design, Bid and Build delivery method.  [Read more...]

Actions: E-mail | Permalink |


Posted on January 01, 2002
A New facility to house Wings & More Restaurant. 8562 SF facility. The dinning area wrapped the elevated bar which can be closed off for special events. Overflow dinning is available on the covered patio, which is kept cool by ceiling fans and heated in the winter.  Suspended televisions can be viewed from every seat in the facility.  [Read more...]

Posted in: Hospitality
Actions: E-mail | Permalink |


Posted on January 01, 2000
A new community center for the “younger crowd” located in Southwood Park adjacent to the College Station Junior High.  Actually, the entire community for special events, with a focus for the younger teens, uses the center as a senior center during school hours and. The center provides meeting spaces, club/activity room, study area, computer room, and administrative offices.  Provide full services. [Read more...]

Actions: E-mail | Permalink |


Posted on January 01, 1998
Brazos County Detention Center Addition, 1998 - 27,700 SF
Free standing 144 bed addition to the 1991 jail structure. Pre-cast concrete and Concrete masonry, medium / maximum security facility on Sandy Point Road for adult, male inmates. 1999-2000  Ravey & Associates provided full services through construction. [Read more...]

Posted in: Governmental
Actions: E-mail | Permalink |

Page 14 of 15First   Previous   6  7  8  9  10  11  12  13  [14]  15  Next   Last