|
|
Education K-12
NO
Image:
Posted on January 01, 2009
Upgrades to the existing facility, new carpet, paint, tile, ceilings, HVAC and window coverings. The exterior plaster was patched and painted and a mow strip was added to the exterior walls.
[Read more...]
Posted on January 01, 2007
10,000 square foot Ag/Science Classroom. The facility is a pre-engineered metal building with brick veneer to match the new adjacent high school appearance. Included in the design are covered parking areas and outdoor classroom areas, woodworking areas, welding area and classrooms.
[Read more...]
Upgrades to the existing facility, new carpet, paint, tile, ceilings, plumbing fixtures. New mow strip around the exterior. The exterior canopies on the facility were upgraded also.
[Read more...]